Show only active batches Show all jobs

Paint Batches

F Label Crdt Location

Batch Steps

Step:
F Rev Label Job Step View

Step Spools

Job Dispid System

Job Information

Customer Name: Location: Job Number(s): Your name: Date Work Was Performed: Day of the Week Work Was Performed: Description of Work Performed:

New Section

Additional comments

Environmental Conditions

Time of Environmental Measurements: Location of Environmental Measurements (DB) Dry Bulb in F
    (WB) Wet Bulb in F
      (RH) % Relative Humidity (30 in. of pressure)
        (ST) Surface Temp in F
          (DP) Dew Point (30 in. of pressure) in F
            ST minus DP
              Test Method Environmental Comments
              (example: "OK to paint", "Too windy" "Dew Point too high", etc.
              Lighting Conditions Of This Project: Illumination Test Required per Control Plan / JHA ?

              Surface Preparation and Coating Application Information

              Compressed Air Test performed to ASTM D4285:
                (Part #; Pc #; Name of Tank; Floor Area; North, South, East or West Side; etc.) Surface Preparation - Cleanliness REQUIRED Surface Preparation - Cleanliness ACTUAL Average Profile Height Method: Coating Manufacturer Name: Coating Product Name: Batch Numbers:
                  Mix Ratio: Mixing Method: Strain / Screen: Sweat-In Time: Continuous Agitation? Mix Time Start: Thinner Name:
                    Thinner Batch Number:
                      Thinner Amount Used: Pot Life Time: Application Method: WFT Spec (mils): WFT Actual (mils): DFT Spec (mils) REQUIRED: DFT Actual (mils) ACTUAL: Quantity Applied (Gals): GAL Items coated have been visually
                      inspected and found to be defect-free.
                      Base DFT Readings for Maint. Painting:
                        Visual Comments or Photograph of Finish

                          QP2 Lead Project

                          Is this a QP2 Lead Project? Proper Barricade Hand Wash Station Break Area Change Room Proper Respirators Resp. Cleaned & Stored Proper Containment Containment Leaks Record corrective actions

                          Inspection Instruments and Equipment Used for This Report

                          Inspection Equipment
                          Description Acquired Expires File
                          Psychrometer Serial Number and Calibration Due Date: Surface Thermometer Serial Number and Calibration Due Date: Dry Film Thickness Gage Serial Number and Calibration Due Date:
                            Film Thickness Standards Serial Number and Calibration Due Date:
                              Holiday Detector Serial Number and Calibration Due Date: Spring Micrometer (for Replica Tape) Serial Number and Calibration Due Date: Dew Point Meter Probe Serial Number and Calibration Due Date:
                                Surface Profile Gage Probe Serial Number and Calibration Date:
                                  Was calibration of DFT Guage verified using thickness standards listed on this page? Was guage within tolerance as required by specification? If no, was guage adjusted within tolerance and reverified?
                                  Upload Report

                                  Paint Matrix

                                  Sys# Service Surface Prep Primer MFG Name Primer Prod Name Primer Thickness 2nd Coat MFG Name 2nd Coat Prod Name 2nd Coat Thickness Topcoat MFG Name Topcoat Prod Name Topcoat Thickness Color Federal Std. 595C # Unit rate system #
                                  Ac Name Location
                                  add
                                  Description Acquired Expires File

                                  Paint Reports

                                  From: To:
                                  F Rev Label Job Step Completed Date View Sign