Filename:
Num Date F L Total !
EWID ST(hrs) OT(hrs) $ST $OT Total X
EWID PWHT(qty) PMI(qty) $PWHT $PMI Total




Can be Invoiced not done Problem
Descr Rev Work Order Location to invoice not done !
  Min:    Drawing Viewer: what
Con. No R Descr Mat Size Wall Qty Mul Rate Total Added !
L Qty Descr WDescript Cost Method Mult Rating Dia/WT T
"1.875<space>red" finds all 1 7/8" diameter parts with "red" somewhere in the description
"2.5x1<space>swa" finds all 2 1/2" diameter parts with 1" diameter and "swa" in the description
"<space>90" finds all parts with "90" somewhere in the description
"4.5|" finds 4.5" diameter pipes